HUXON ENGINEERING SOLUTIONS LTD is a UK-based company specialising in civil engineering support services and UAV surveying. Founded on over 16 years of hands-on experience in construction and infrastructure projects, we provide precise and efficient geospatial solutions for engineering, design, and progress monitoring. We work with contractors, designers and developers, supporting critical project stages — from enabling works and earthworks to structural construction and as-built documentation.
Proven Track Record
We have successfully delivered engineering and surveying services across England, Scotland, and the Shetland Islands. Our team have contributed to major projects including:
- A30 – Chiverton to Carland Cross
- HS2 – High-Speed Rail
- AWPR – Aberdeen Western Peripheral Route
- A14 – Cambridge to Huntingdon Improvement Scheme
- Viking Wind Farm – Shetland
- Stonehaven Flood Protection Scheme
We provide a wide range of services for infrastructure and construction projects across the UK, including:
✔️ Drone surveying for aerial mapping and inspection
✔️ QA/QC documentation, ITPs and full quality records management
✔️ Coordination of NCRs (Non-Conformance Reports) and technical queries
✔️ Completion of TBS (Task Briefing Sheets) for daily site operations
✔️ Supervision of drainage, roadworks, RC structures and utilities
✔️ Production and review of RAMS (Risk Assessments & Method Statements)
✔️ Planning of works and scope definition in line with spec & design
✔️ 3D model preparation for digital site control
✔️ Subcontractor management and logistics coordination
✔️ Setting out and surveying (Total Station, GNSS RTK)
✔️ Temporary works support and compliance inspections
✔️ Mass volume calculations using photogrammetry & 3D data
✔️ Health & Safety leadership, hazard identification, briefings
HUXON ENGINEERING SOLUTIONS LTD provided engineering support for this major highways upgrade in Cornwall. Our responsibilities covered planning and supervision of works, precise setting out using 3D models, quantity verification through volume calculations, and quality assurance across all construction stages. We worked closely with the delivery team to ensure safe, efficient, and specification-compliant execution throughout the project.
Before establishing HUXON ENGINEERING SOLUTIONS LTD, our lead engineer played a key role in delivering engineering services on this nationally significant rail project.Responsibilities included haul road stabilisation, embankment formation, drainage installation, and ground improvement using lime and cement treatment.The works were executed with a strong focus on planning, quality, and compliance throughout all stages of construction.
Our engineer provided specialist surveying and inspection services for the Viking Wind Farm prior to the formation of HUXON ENGINEERING SOLUTIONS LTD.Services included drone-based photogrammetry of borrow pits, volume calculation, layout and inspections for reinforced concrete turbine bases.Operating in remote, weather-exposed conditions helped build the precision mindset we apply across all our services today.
In the years before establishing HUXON ENGINEERING SOLUTIONS LTD, our engineer was involved in delivering flood defence works in Stonehaven, Aberdeenshire.Contributions included setting out of reinforced concrete structures, inspections, roadworks and drainage, under challenging weather and environmental constraints.This critical infrastructure project helped protect the local community from flood risk.
Our engineer took part in Section 4 of the A14 upgrade prior to the formation of HUXON ENGINEERING SOLUTIONS LTD.Responsibilities covered setting out and QA for slipform concrete works including DCB barriers, slot drains and V channels.3D models were used for layout precision, with coordination between subcontractors to meet strict deadlines and compliance standards.
Before founding HUXON ENGINEERING SOLUTIONS LTD, our engineer contributed to the AWPR project, improving transport connectivity across the region.Duties included setting out, surveying, and supervision of earthworks, drainage, road pavements and RC structures.The role involved subcontractor management and H&S coordination on a multi-phase highway project under tight delivery targets.